Construction and Building

The Construction Industry produces one third of the UK's total waste each year, which is some 120 million tonnes!

However, it is estimated that 85% of this waste material can be recycled, (source: Construction Recycling Alliance).

KWM recycles the following construction waste material:

  • Pipes
  • Wheelie bins
  • Polythene shrinkwrap,
  • Sandbags,
  • Grit-bags

*(Linings must be separated and free of rubble)

Contact us today:

  • For further information
  • To book a delivery slot
  • Or to schedule a collection

Call Kingsnorth Waste Ltd. at: 01634 253557

Email us at: Kingsnorthwaste@yahoo.co.uk

Have a Query? Just drop us a line and include your NAME and PHONE NUMBER for prompt service!